• -$10.00
Linhai ATV Demon - Workshop Manual & Wiring Diagram
search
  • Linhai ATV Demon - Workshop Manual & Wiring Diagram

Linhai ATV Demon - Workshop Manual & Wiring Diagram

$29.95
$19.95 Save $10.00
No tax
Quantity

YOUTUBE Official Channel @SoloPDFcom (+18,000 subs). Trusted by mechanics worldwide using professional workshop manuals and wiring diagrams.

Linhai ATV Demon - Workshop Manual & Wiring Diagram

Technical documentation for Linhai ATV Demon combining service or workshop information with electrical diagram material specifically identified in the source index.

What is included: ATV service and maintenance procedures with a specifically identified wiring diagram at section 8.14.

Document language information stated in the original listing: English.

Documented technical coverage

The source table of contents specifically lists 1.2 v.i.n and engine serial number; 3.1.9 Transmission belt 3.8 Carburettor; 4.1 front wheel / hub / drum brake; 2.2 fuel system.

Diagram scope: The electrical material is limited to the sections specifically listed below; other schematics are not implied.

Original technical index

  • GENERAL INFORMATION
  • - 1.1 important information
  • - 1.2 v.i.n and engine serial number
  • - 1.3 vehicle dimensions
  • MAINTENANCE
  • - 2.1 periodic maintenance
  • - 2.2 fuel system
  • - 2.3 toe alignment
  • - 2.4 braking system inspection
  • - 2.5 suspension spring preload adjustment
  • - 2.6 wheels
  • - 2.7 tire pressure
  • - 2.8 frame, nuts, bolts, fasteners
  • 260/ 300 ENGINE
  • - 3.1 maintenance specifications
  • - 3.1.1 specifications
  • - 3.1.2 tightening torques
  • - 3.2 parts inspection and service
  • - 3.2.1 valve clearance adjustment
  • - 3.2.2 idling speed adjustment
  • - 3.2.3 spark plug inspection
  • - 3.2.4 compression pressure
  • - 3.2.5 engine oil level inspection
  • - 3.2.6 coolant level inspection
  • - 3.3 cylinder head
  • - 3.4 camshaft and rocker arms
  • - 3.5 valves and valve springs
  • - 3.6 cylinder and piston
  • - 3.7 v-belt, clutch and secondary/primary sheave
  • - 3.8 a.c. magneto and starter clutch
  • - 3.9 oil pump
  • - 3.10 crankcase and crankshaft
  • - 3.11 cooling system
  • - 3.11.1 radiator
  • - 3.11.2 water pump
  • - 3.11.3 thermostat
  • - 3.12 carburettor
  • 50 / 80 ENGINE
  • - 3.1 Scheduled Maintenance 3.6 the crankcase & the crankshaft
  • - 3.1.1 General information 3.6.1 important points
  • - 3.1.2 Air Filter 3.6.2 dismantling the crankcase
  • - 3.1.3 Spark plugs 3.6.3 the crankshaft
  • - 3.1.4 Valve Adjustment 3.6.4 assembling the crankcase
  • - 3.1.5 Carburettor idle speed 3.7 Lubricating system
  • - 3.1.6 Ignition time 3.7.1 over all engine requirements
  • - 3.1.7 Cylinder pressure 3.7.2 Engine oil / filter screen
  • - 3.1.8 Final reduction gear oil checking 3.7.3 Oil pump
  • - 3.1.9 Transmission belt 3.8 Carburettor
  • - 3.2 Cylinder head, Valve 3.8.1 General Information:
  • - 3.2.1 Important information 3.8.2 Disassembly of carburettor
  • - 3.2.2 Disassembling of camshaft 3.8.3 Assembly of carburettor
  • - 3.2.3 Disassembly of cylinder head 3.9 Starter system
  • - 3.2.4 Camshaft assembly 3.9.1 Installation information
  • - 3.3 the cylinder and the piston 3.9.2 Starter Motor
  • - 3.3.1 Important points 3.9.3 Starter pinion
  • - 3.3.2 Removing the cylinder 3.10 Magneto
  • - 3.3.3 Removing the piston 3.10.1 Dismantling:
  • - 3.3.4 Assembling the piston 3.10.2 Assembling
  • - 3.3.5 Assembling the cylinder 3.11 Ignition System
  • - 3.4 driving belt device & the starting lever
  • - 3.4.1 Important points
  • - 3.4.2 The left crankcase cover detaching
  • - 3.4.3 Installing the starting assembly
  • - 3.4.4 The driving belt
  • - 3.4.5 The driving pulley dismounting
  • - 3.4.6 Assembling the driving pulley
  • - 3.4.7 The clutch/transmission pulley
  • - 3.5 the final transmission assembly
  • - 3.5.1 Instructions
  • - 3.5.2 Dismantling the final transmission assembly
  • - 3.5.3 Detach the final transmission gear box cover
  • - 3.5.4 Assembling the final gear set
  • 100/125/150/200 ENGINE
  • - 3.1 preparation for removal procedures
  • - 3.2 replacement parts
  • - 3.2.1 gaskets, oil seals and o-rings
  • - 3.2.2 bearings and oil seals
  • - 3.3 periodic inspection and adjustment
  • - 3.3.1 air filter
  • - 3.3.2 spark plug
  • - 3.3.3 valve clearance adjustment
  • - 3.3.4 carburettor idle adjustment
  • - 3.3.5 transmission oil inspection (for mini atv100/150)
  • - 3.3.6 transmission oil inspection (for b-type 150/200)
  • - 3.3.7 crankcase oil inspection
  • - 3.4 engine removal and installation
  • - 3.4.1 cylinder head
  • - 3.4.2 cylinder body, piston and piston ring
  • - 3.4.3 v-belt, and cvt
  • - 3.4.4 transmission (for mini atv100/150)
  • - 3.4.5 transmission (for b-type 150/200)
  • - 3.4.6 crankcase and crankshaft
  • - 3.4.7 magneto
  • - 3.4.8 electric starter
  • - 3.4.9 oil pump
  • - 3.5 carburation
  • - 3.6 tightening torques of engine main fasteners
  • - 3.7 ignition system
  • - 3.7.1 installation information
  • - 3.7.2 troubleshooting
  • - 3.7.3 cdi inspection
  • - 3.7.4 ignition coil
  • - 3.7.5 magneto
  • CHASSIS
  • - 4.1 a-rm replacement
  • - 4.2 swing arm
  • - 4.3 front strut replacement
  • - 4.4 front strut ball joint replacement
  • - 4.5 steering post assembly
  • CHASSIS (YOUTH/ MINI ATV)
  • - 4.1 front wheel / hub / drum brake
  • - 4.2 a-rm replacement
  • - 4.3 final drive
  • - 4.4 swing arm
  • FINAL DRIVE
  • - 5.1 wheel, hub, and spindle torque table
  • - 5.2 front hub disassembly/inspection
  • - 5.3 front hub assembly
  • - 5.4 front hub installation (2wd)
  • - 5.5 front drive axle (inner and outer cv joint) removal/inspection (4x4)
  • - 5.6 front drive axle installation (4x4)
  • - 5.7 front drive axle disassembly/ inspection (4x4)
  • - 5.8 front drive axle assembly (4x4)
  • - 5.9 rear hub inspection
  • - 5.10 rear axle removal
  • - 5.11 rear axle installation
  • - 5.12 rear axle bearing removal
  • - 5.13 rear axle bearing installation
  • - 5.14 rear gear case disassembly
  • - 5.15 rear gear case assembly
  • - 5.16 front gear case slip limit torque test (4x4)
  • - 5.17 front gear case disassembly/ inspection (4x4)
  • - 5.18 front gear case assembly (4x4)
  • - 5.19 front differential disassembly/ inspection (4x4)
  • - 5.20 front differential assembly (4x4)
  • - 5.21 rear, front prop shaft removal
  • - note. electric 4wd shift---see chapter 8 electrical
  • TRANSMISSION
  • - 6.1 gear shifter removal
  • - 6.2 gear shifter disassembly
  • - 6.3 gear shifter assembly
  • - 6.4 gear shifter installation
  • - 6.5 shift linkage adjustment
  • - 6.6 engine and transmission removal
  • - 6.7 engine and transmission installation
  • - 6.8 transmission disassembly
  • - 6.9 transmission assembly
  • - 6.10 trouble shooting checklist
  • BRAKES
  • - 7.1 specifications
  • - 7.2 torque
  • - 7.3 brake system service notes
  • - 7.4 burnishing procedure
  • - 7.5 fluid replacement/bleeding procedure- 7.6 hand brake master cylinder removal/ inspection /installation
  • - 7.7 front pad removal / inspection / installation
  • - 7.8 front disc inspection / removal / replacement
  • - 7.9 front caliper removal/ inspection / installation
  • - 7.10 rear brake pad removal/ inspection / installation
  • - 7.11 rear caliper removal/ inspection/ installation
  • - 7.12 rear brake disc inspection / removal / replacement
  • ELECTRICAL
  • - 8.1 parts inspection and service
  • - 8.2 battery
  • - 8.3 ignition system
  • - 8.4 charging system
  • - 8.5 electrics starting system
  • - 8.6 cooling system
  • - 8.7 lighting system
  • - 8.8 reverse limit system
  • - 8.9 gear position indicator switch test
  • - 8.10 speedometer system
  • - 8.11 main switch and handle switch
  • - 8.12 fuel gauge/ fuel level sensor
  • - 8.13 the operation principle of the electric 4wd shift
  • - 8.14 wiring diagram