• -$10.00
Hitachi ZX470 5G Excavator Service & Wiring Manuals
search
  • Hitachi ZX470 5G Excavator Service & Wiring Manuals

Hitachi ZX470 5G Excavator Service & Wiring Manuals

$29.95
$19.95 Save $10.00
No tax
Quantity

YOUTUBE Official Channel @SoloPDFcom (+18,000 subs). Trusted by mechanics worldwide using professional workshop manuals and wiring diagrams.

Hitachi ZX470 5G Excavator Service & Wiring Manuals

This digital download includes workshop, service and electrical documentation.

Topics include Bleeding Air from Fuel System; Bleeding Air from Hydraulic Oil Tank; Disassembly of Brake Valve.

Manual contents

  • CONTENTS:
  • INTRODUCTION
  • SYMBOL AND ABBREVIATION
  • SAFETY
  • SECTION AND GROUP CONTENTS
  • SECTION 1 GENERAL
  • - Group 1 Precautions for Disassembling and Assembling
  • - Precautions for Disassembling and Assembling
  • - Group 2 Tightening
  • - Tightening Bolts and Nuts
  • - Piping Joint
  • - Group 3 Painting
  • - Painting Specification
  • - Final Painted Color
  • - Group 4 Bleeding Air
  • - Bleeding Air from Hydraulic Oil Tank
  • - Bleeding Air from Hydraulic System
  • - Bleeding Air from Fuel System
  • - Bleeding Air from Radiator
  • - Group 5 Pressure Release Procedure
  • - Hydraulic Circuit Pressure Release Procedure
  • - Group 6 Preparation
  • - Preparation before Inspection and Maintenance
  • SECTION 2 MAINTENANCE STANDARD
  • - Group 1 Upperstructure
  • - Main Pump
  • - Swing Motor
  • - Group 2 Undercarriage
  • - Travel Motor
  • - Sprocket
  • - Center Joint
  • - Front Idler
  • - Upper Roller
  • - Lower Roller
  • - Track
  • - Group 3 Front Attachment
  • - Remove and Install Bushing
  • - Pin and Bushing
  • - Side Cutter
  • - Point
  • - Standard Dimensions for Arm and Bucket Connection
  • - Standard Dimensions for Arm and Boom Connection
  • - Cylinder
  • SECTION 3 UPPERSTRUCTURE
  • - Group 1 Cab
  • - Removal and Installation of Cab
  • - Dimensions of Cab Glass (Standard Cab)
  • - Dimensions of Cab Glass (H Cab)
  • - Group 2 Counterweight
  • - Removal and Installation of Counterweight
  • - Group 3 Main Frame
  • - Removal and Installation of Main Frame
  • - Group 4 Engine
  • - Removal and Installation of Engine
  • - Group 5 Radiator Assembly
  • - Replacement of Radiator and Oil Cooler
  • - Group 6 Hydraulic Oil Tank
  • - Removal and Installation of Hydraulic Oil Tank
  • - Group 7 Fuel Tank
  • - Removal and Installation of Fuel Tank
  • - Group 8 Pump Device
  • - Removal and Installation of Pump Device
  • - Disassembly of Main Pump
  • - Assembly of Main Pump
  • - Disassembly of Regulator for Main Pump
  • - Assembly of Regulator for Main Pump
  • - Structure of Pilot Pump
  • - Structure of A Sensor
  • - Group 9 Control Valve
  • - Removal and Installation of Control Valve
  • - Disassembly and Assembly of Valve Unit
  • - Disassembly of Control Valve (4-Spool Side)
  • - Assembly of Control Valve (4-Spool Side)
  • - Disassembly of Control Valve (5-Spool Side)
  • - Assembly of Control Valve (5-Spool Side)
  • - Group 10 Swing Device
  • - Removal and Installation of Swing Device
  • - Disassembly of Swing Device
  • - Assembly of Swing Device
  • - Disassembly of Swing Motor
  • - Assembly of Swing Motor
  • - Group 11 Pilot Valve
  • - Removal and Installation of Pilot Valve (Left)
  • - Removal and Installation of Pilot Valve (Right)
  • - Removal and Installation of Travel Pilot Valve
  • - Disassembly of Pilot Valves (Right and Left)
  • - Assembly of Pilot Valves (Right and Left)
  • - Disassembly of Travel Pilot Valve
  • - Assembly of Travel Pilot Valve
  • - Group 12 Solenoid Valve
  • - Removal and Installation of Pilot Shut-Off Solenoid Valve
  • - Removal and Installation of 4-Spool Solenoid Valve Unit
  • - Removal and Installation of 2-Spool Solenoid Valve Unit
  • - Disassembly of Pilot Shut-Off Solenoid Valve
  • - Assembly of Pilot Shut-Off Solenoid Valve
  • - Structure of 4-Spool Solenoid Valve Unit
  • - Structure of 2-Spool Solenoid Valve Unit
  • - Group 13 Signal Control Valve
  • - Removal and Installation of Signal Control Valve
  • - Structure of Signal Control Valve
  • - Group 14 Shockless Valve
  • - Removal and Installation of Shockless Valve
  • - Structure of Shockless Valve
  • SECTION 4 UNDERCARRIAGE
  • - Group 1 Swing Bearing
  • - Removal and Installation of Swing Bearing
  • - Disassembly of Swing Bearing
  • - Assembly of Swing Bearing
  • - Group 2 Travel Device
  • - Removal and Installation of Travel Device
  • - Disassembly of Travel Device
  • - Assembly of Travel Device
  • - Disassembly of Travel Motor
  • - Assembly of Travel Motor
  • - Disassembly of Brake Valve
  • - Assembly of Brake Valve
  • - Group 3 Center Joint
  • - Removal and Installation of Center Joint
  • - Disassembly of Center Joint
  • - Assembly of Center Joint
  • - Replacement of Body and Spindle
  • - Group 4 Track Adjuster
  • - Removal and Installation of Track Adjuster
  • - Disassembly of Track Adjuster
  • - Assembly of Track Adjuster
  • - Group 5 Front Idler
  • - Removal and Installation of Front Idler
  • - Disassembly of Front Idler
  • - Assembly of Front Idler
  • - Group 6 Upper and Lower Rollers
  • - Removal and Installation of Upper Roller
  • - Removal and Installation of Lower Roller
  • - Disassembly of Lower Roller
  • - Assembly of Lower Roller
  • - Group 7 Track
  • - Removal and Installation of Track
  • SECTION 5 FRONT ATTACHMENT
  • - Group 1 Front Attachment
  • - Removal and Installation of Front Attachment
  • - Removal and Installation of Bushing
  • - Group 2 Cylinder
  • - Removal and Installation of Boom Cylinder
  • - Removal and Installation of Arm Cylinder
  • - Removal and Installation of Bucket Cylinder
  • - Disassembly of Boom Cylinder
  • - Assembly of Boom Cylinder
  • - Disassembly of Arm Cylinder
  • - Assembly of Arm Cylinder
  • - Disassembly of Bucket Cylinder
  • - Assembly of Bucket Cylinder
  • SECTION 6 ENGINE AND ACCESSORY
  • - General Information
  • - General Repair Instruction
  • - Illustration Arrows
  • - Abbreviations Charts
  • - Nut and Bolt Angular Tightening Method
  • - Standard Bolt Torque Specifications
  • - Recommended Thread Locking Agents
  • - Main Data and Specification
  • - Performance Curve
  • - Engine External Drawing
  • - Service Standard
  • - Torque Specifications
  • - Special Tools
  • - Troubleshooting
  • - Lubricant Application
  • - Sealant Application
  • - Service Information
  • - Identification
  • - Lubrication System
  • - Fuel System
  • - Cooling System
  • - Valve Clearance Adjustment
  • - Compression Pressure Measurement
  • - Recommended Lubricants
  • - Engine Oil Viscosity Chart
  • - Engine Mechanical
  • - Service Precautions
  • - General Description
  • - Fan Center
  • - Turbocharger
  • - Exhaust Manifold
  • - Inlet Manifold
  • - Water Pump
  • - Alternator
  • - Oil Cooler
  • - Injection Pump
  • - Coupling Assembly
  • - Cylinder Head
  • - Rocker Arm and Shaft Assembly
  • - Camshaft
  • - Timing Gears
  • - Flywheel Housing
  • - Oil Pan
  • - Piston
  • - Crankshaft
  • - Crank Pulley
  • - Flywheel
  • - Cylinder Block
  • - Engine Cooling
  • - Service Precautions
  • - General Description
  • - Water Pump
  • - Thermostat
  • - Engine Fuel
  • - Service Precautions
  • - General Description
  • - Fuel Filter
  • - Injection Nozzle Holder
  • - Injection Pump
  • - Injection Nozzle Holder-Tow-Stage Injection Type
  • - Starting and Charging
  • - Service Precautions
  • - Alternator
  • - Starter Motor
  • - Engine Lubrication
  • - Service Precaution
  • - General Description
  • - Oil Pump
  • - Oil Cooler
  • - Engine Induction
  • - Service Precaution
  • - Turbocharger
  • SERVICE MANUAL REVISION REQUEST FORM